Quote:
Originally Posted by anuj.mca
Hi Ishbis,
Don't know why, but it seems like the work at lotus zing site is partially stopped. Tower 7 was reached 4th floor previous month only, casting for roof was done and only the concrete layering was pending. It is still in the same condition even after an entire month, that too when the 5th installment is due on the completion of 4th floor roof.
If someone has the visiblity on the reason of why the construction has stopped or slowed down, please let us know.
Regards,
Anuj
|
i go0t chance to go there 2 days back but could not check all towers due to time constraint, front tower work was going on..