View Single Post
Old 03-09-09   #13
paragdere is offline paragdere
New Member
 
Join Date: Aug 2009
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Thumbs down Details of the scheme

Hi all,
I called them up to get the details. What really confused me was when they say that it is N.A. (proposed). In the presentation which they sent out, it said the N.A should be done by Sept 2009. Also another confusing point is, they would not allocate a plot the moment. This would only happen when the land gets converted in N.A. No development would be possible for next 2 years.
No doubt that the proposed scheme is very tempting, but is there a way in which we can be assured that the investment would be safe ? I am not convinced with the PDC as an assurance of the price appretiation.
  Reply With Quote