Old 20-03-12   #1
New Member
 
Join Date: Mar 2012
Posts: 4
Likes Received: 0
Likes Given: 0
Default Flat deviation

We are planning to buy a flat.

The builder has built a total of 10 flats in two separate blocks: Block A (contains 4 flats) and Block B (contains 6 flats) in a land comprising of total 5508 sq ft.

Block B has 3 flats in first floor and 3 in second floor. Block A has 2 flats in ground floor and 2 flats in first floor.

The entire ground floor open area in Block B is allotted as a common parking space for both block A and block B users.

The flat that we have chosen lies in Block A first floor. The approved plan for Block A shows 6 flats (3 flats in ground and first floor), but the builder has built only 4 flats (2 flats in ground and first floor).

The builder says this is an acceptable deviation only and no risks involved. Also, says this deviation cannot be revised as the construction has been fully completed.

We have not signed any agreements yet with the builder and only booking has been completed.

Pls. advise me whether this is an acceptable deviation and let us know the risks involved (if any).

Also, let us know whether any other documents/clauses to be included in the agreement.

Thank you.
  Reply With Quote
Old 21-03-12   #2
Member
 
Join Date: Jun 2010
Posts: 75
Likes Received: 12
Likes Given: 2
Default

You will have challenge in getting bank loan if they plan doesn't match with actual construction. This is 100% true for nationalized banks. Other banks may consider. I would suggest don't got for it. Simply because, later if you want to sell, you will run into similar issues. One can understand a deviation on the setbacks and some minor deviation in common areas. This one seems to be a big violation.
  Reply With Quote
Old 21-03-12   #3
New Member
 
Join Date: Mar 2012
Posts: 4
Likes Received: 0
Likes Given: 0
Default

Thanks for your reply.

We checked with the builder on this. The builder insists that it is just a deviation (not a violation) as he has built only 4 flats (instead of 6). Also, says he has proportionally shared all the UDS to 4 flats and also got the property tax with correct flat details.

Also, assures that he will mention the actual flat details in the construction agreement. When asked about re-sale issues, he says this wont be a problem, since we have the property tax with correct flat details.

Please guide me. Your suggestion is highly appreciated.
  Reply With Quote
Old 22-03-12   #4
Member
 
Join Date: Jun 2010
Posts: 75
Likes Received: 12
Likes Given: 2
Default

Well. Deviation is a deviation and banks treat it that way. I bought a second sale flat and SBI rejected the loan since there is a minor deviation between the approved plan and actual (FSI was deviated 1.28 approved Vs 1.32). Finally had to arrange the funds thru other sources. Property tax receipt alone will not do any good. It will not reflect any deviation in the entire building. Banks do want to match the plan and actuals.
In my case, the flat was under homeloan and hence confidently signed the sale agreement. However the loan was taken about 11 years back and during those days banks were not that strict. Lesson learned.
If I were you, I will look for another property.
  Reply With Quote
Old 22-03-12   #5
Member
 
Join Date: Sep 2010
Posts: 151
Likes Received: 9
Likes Given: 30
Default

Alternatively, can we ask the builder to get the plans re-approved by CMDA since he had claimed that it is not a violation but deviation as you had mentioned.
  Reply With Quote
Old 23-03-12   #6
New Member
 
Join Date: Mar 2012
Posts: 4
Likes Received: 0
Likes Given: 0
Default

Thanks Garuda and Kaishu for your valuable inputs.

Sorry to bother again. We have already paid a token amount of 1 Lakh for booking.

The flats are now fully constructed and almost at the "ready to occupy" condition. Is it still possible to get the plan revised/re-approved by CMDA ?
  Reply With Quote
Old 26-03-12   #7
New Member
 
Join Date: Mar 2012
Posts: 4
Likes Received: 0
Likes Given: 0
Default

Sub: Lesson learnt.

We also checked with a Panel valuer and been told that these are very common nowadays. Also, got a legal opinion and been told the same.

Now, the choice and decision can be taken after serious consideration.

I'm just posting my own views/comments so that it will help someone at some point of time.
  Reply With Quote
Reply

Tags
deviation, flat, flats deviation chennai

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Deviation allowed in Apartment prasathvishnu Bangalore 4 14-01-13 10:20 AM
How to buy a flat with Clean and Zero Deviation without any hassle prasathvishnu Bangalore 2 07-05-11 11:06 AM
Building Plan deviation in Flat kannansnkl Chennai 3 10-01-10 12:15 PM
Deviation 2.10 chellakani Chennai 1 21-11-09 06:05 PM
Home Loan Got rejected due to deviation in flat chellakani Chennai 0 19-11-09 05:37 PM

ADVERTISE ON THIS WEBSITE - CONTACT US NOW
All times are GMT +5.5. The time now is 08:30 AM.



Home | About IREF | Terms and Conditions | Copyright Infringement Policy
Copyright © 2006-2013, www.indianrealestateforum.com, All Rights Reserved.
Bookmark and Share