    Re : What is the Status of Sector Roads in New Gurgaon?

    24 meter wide connecting road from NPR to Ramprastha City

    Hi all,

    I don't know whether it was shared before or not , anyhow I am sharing in this thread from the Ramprastha's presentation to RCWA...


    Key Plan
    Click image for larger version

Name:	CONNECTING ROAD.jpg
Views:	3
Size:	53.2 KB
ID:	2220724

    2+2 lane road under construction ...
    Click image for larger version

Name:	24 M UC.jpg
Views:	3
Size:	33.0 KB
ID:	2220725
    Attached Files
    __________________________________________________ __________
    It is better to be blind than to see things from only one point of view

    Comment

    • #32

      #32

      Re : What is the Status of Sector Roads in New Gurgaon?

      Originally posted by mitraa View Post
      Designer bhai

      Rp works only on photoshop.... The road like this have been there for last 3-4 months i guess for their site office DWX side ..






      Sent from my iPhone using Tapatalk - now Free
      Mitraa ji,

      Nice to see your photo updates of 20th Dec in following thread ; road connecting Dwarka Expressway to Rampratha City...


      http://www.indianrealestateforum.com...-post9782.html
      Click image for larger version

Name:	IREF.jpg
Views:	4
Size:	104.9 KB
ID:	2221159

      Now, its confirmed that actual road construction work is going on connecting road, hope it will be ready and landscaped before possession of it first project ( I dont't know whether it was Edge/Atrium or Rise) next year...

      Attached Files
      __________________________________________________ __________
      It is better to be blind than to see things from only one point of view

      Comment

      • #33

        #33

        Re : What is the Status of Sector Roads in New Gurgaon?

        Originally posted by mitraa View Post
        Designer bhai

        Rp works only on photoshop.... The road like this have been there for last 3-4 months i guess for their site office DWX side ..






        Sent from my iPhone using Tapatalk - now Free
        Mitraa ji,

        Nice to see your photo updates of 20th Dec in following thread ; road connecting Dwarka Expressway to Rampratha City...


        http://www.indianrealestateforum.com...-post9782.html
        Click image for larger version

Name:	IREF.jpg
Views:	4
Size:	104.9 KB
ID:	2221159

        Now, its confirmed that actual road construction work is going on connecting road, hope it will be ready and landscaped before possession of it first project ( I dont't know whether it was Edge/Atrium or Rise) next year...

        Attached Files
        __________________________________________________ __________
        It is better to be blind than to see things from only one point of view

        Comment

        • #34

          #34

          Re : What is the Status of Sector Roads in New Gurgaon?

          sector road, sector 37 gurgaon, takshila ready for possession?

          Originally posted by Takshila View Post
          Originally posted by rameshlatest View Post
          Yes...looks like finally this sector would start taking shape now with road construction started. This should be connecting with pataudi road I guess

          Hi
          Greetings

          Any news of OC applied? If yes, Part or Full?

          Tower 8 is all painted probably being prepared for possession. Many other towers have doors windows, glass panes in place. EWS in place and railings installed.

          If possession happens, it would be the first project in 3x to be delivered and deserves appreciation.

          Please locate/mark 24 Mtr sector road "WARK" start on the attached google earth jpg file.

          Is it between Corona and Takshila or Imperia and Takshila?

          Cheers
          Attached Files

          Comment

          • #35

            #35

            Re : What is the Status of Sector Roads in New Gurgaon?

            Sector and Master Roads 37c and 37d

            Hi
            Greetings

            Heard that work on Master and Sector roads of sector 37c/d have started with markings, material and labour movement at site.

            Those visiting the area may kindly share the status.

            Cheers

            Comment

            • #36

              #36

              Re : What is the Status of Sector Roads in New Gurgaon?

              Originally posted by BlessU View Post
              Hi
              Greetings

              Heard that work on Master and Sector roads of sector 37c/d have started with markings, material and labour movement at site.

              Those visiting the area may kindly share the status.

              Cheers
              .......

              Const. of dividing road Sector-
              37C & 37D, Gurgaon
              855.77 lacs
              CA No. 17210-13
              Dt. 10.07.2014
              500.00
              START DATE: 21.08.2014 -- --
              Projected COMPLETION DATE: 20.02.2015

              Work amounting to Rs. 767.80 lacs allotted to
              contractor vide EE-IV, HUDA, GGN letter
              No. 11216 dated 21.08.2014 to M/s Rama
              Parstha
              as per framed HUDA policy.

              Comment

              • #37

                #37

                Re : What is the Status of Sector Roads in New Gurgaon?

                Dear blessu

                Greetings!!

                Pics are shared by venky in one of the rp threads by venky...,

                Its a positive development for sector road

                Originally posted by BlessU View Post
                .......

                Const. of dividing road Sector-
                37C & 37D, Gurgaon
                855.77 lacs
                CA No. 17210-13
                Dt. 10.07.2014
                500.00
                START DATE: 21.08.2014 -- --
                Projected COMPLETION DATE: 20.02.2015

                Work amounting to Rs. 767.80 lacs allotted to
                contractor vide EE-IV, HUDA, GGN letter
                No. 11216 dated 21.08.2014 to M/s Rama
                Parstha
                as per framed HUDA policy.

                Comment

                • #38

                  #38

                  Re : What is the Status of Sector Roads in New Gurgaon?

                  Tender for Const. of dividing road Sector-37C & 37D, Gurgaon

                  Originally posted by mitraa View Post
                  Dear blessu

                  Greetings!!

                  Pics are shared by venky in one of the rp threads by venky...,

                  Its a positive development for sector road
                  Hi
                  Greetings

                  If I remember correctly some pics of RP internal township were shared about 6 months back.

                  I think I have either missed or probably there has been no picture from anyone on the forum defined as "Const. of dividing road Sector-37C & 37D, Gurgaon", in the subject tender. Besides this tender is released only recently in Aug 14 and reported last month in public view.

                  Request members to share inputs of any sector/Master roads in 37x/d, as NO TENDER BY HUDA for sector/Master roads was earlier ever allotted. Therefore, this becomes all the more important from the point of view of connectivity of RP and other projects to Dway/ Pataudi Road and Basai Road.

                  I am also interested in knowing the master plan for 37c/d, if someone can kindly share the same.

                  Cheers

                  Comment

                  • #39

                    #39

                    Re : What is the Status of Sector Roads in New Gurgaon?

                    Hi
                    Greetings

                    Some further development on Public Infra Related Tender by HUDA for 37C/D in terms of Storm water drainage provision has been issued

                    Construction Of Outfall Drains Master Swd Leg-I &Ii With Rcc Box Drain From Railway Culvert No. 50 Upto Nazafgarh Drain
                    And
                    Providing External Storm Water Drainage Of Sector 37 C, D Sector 99 To 115 Gurgaon,
                    Construction Of Various Sizes Rcc Box Drian With Ready Mix Concrete M-25 Grade Including Centering And And Shuttering,
                    Providing And Fixing Of Water Stopper 250 Mm Wide 8Mm To 11 Mm Thickness With Central Bulb & Bituminous Board.
                    Haryana Urban Development Authority

                    TDR: 6192415 Location: Haryana - India Tender Value: 264.90 Crore
                    Tender Information

                    Tender No 1/43

                    Comment

                    • #40

                      #40

                      Re : What is the Status of Sector Roads in New Gurgaon?

                      Hi
                      Greetings

                      Activity towards 37c, Imperia Esfera 24mtr and 60 mtr sector, master road dividing 37c/d in progress.

                      Possession Soon banner flashing big and loud on Imperia Esfera site!!!



                      Cheers