  • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

    Originally posted by manuvihaan View Post
    Delhi’s IGI Airport has been ranked number one in the world in the 24-40 million passenger segment. If i am not wrong T3 was built in 36 months . We are optimistic because Hindustan even with its own set of varied problems has given us something to be optimistic. Its not whether it will ....its only when it will be on the cards of people who matter....
    And also Delhi Metro! We also have people like Sridharan in the same Hindustan. Lets not pull down our country for few people with vested interests who don't even hesitate bringing country's name on such trivial matters and quote negatives only They should not forget the adage " Bura jo dekhan main chala........"
    Last edited by illusionist13; July 13 2015, 01:40 PM.

    Comment


    • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

      Originally posted by mkg007 View Post
      Check out these links picked up from Sobha International City's site that show current connectivity to Sector-109 from NH-8 via Dwarka link road and Bijwasan respectively...

      https://www.youtube.com/watch?v=ljEbbA4e22o

      https://www.youtube.com/watch?v=onIX3y9Clrw
      Correct mkg ...Once this Bijwasan Flyover Constructed will be the Shortest Route than Dwarka/UER/BHARTHAL/BAMNOLI....We can avoid this long route....
      Starting of Bijwasan ROB will be a milestone for all 10x sectors.

      Comment


      • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

        Originally posted by sunnyj View Post
        Correct mkg ...Once this Bijwasan Flyover Constructed will be the Shortest Route than Dwarka/UER/BHARTHAL/BAMNOLI....We can avoid this long route....
        Starting of Bijwasan ROB will be a milestone for all 10x sectors.
        The flyover combined with widening of link rd joining Najafgarh -kapashera to 75 m shall be a milestone indeed .
        Last edited by manuvihaan; July 13 2015, 05:11 PM.

        Comment


        • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

          Originally posted by manuvihaan View Post
          the flyover combined with widening of link rd joining najafgarh -kapashera to 75 m shall be a milestone indeed .
          Click image for larger version

Name:	uploadfromtaptalk1436791450094.jpg
Views:	1
Size:	71.0 KB
ID:	2261980

          Comment


          • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

            Originally posted by sunnyj View Post
            Correct mkg ...Once this Bijwasan Flyover Constructed will be the Shortest Route than Dwarka/UER/BHARTHAL/BAMNOLI....We can avoid this long route....
            Starting of Bijwasan ROB will be a milestone for all 10x sectors.
            Bhai, when is this flyover likely to be opened for traffic?

            Comment


            • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

              Hi All. Apologies for diverting the subject but need urgent advise. Wanted to buy something last year but couldn't close. Restarted my search again and shortlisted in following projects with price am getting at for 3bhk flat around 2000sq ft.
              1. Chintels Serenity
              2. Emaar Imperial Garden
              3. Heritage Max
              Pls advise on this considering the specs and location of all these projects. Timeframe is 3 years. For tentative self use and appreciation prospects too if decides not to settle in NCR. Also pls feel free to add in case there are any other better options available.

              Advise of seniors will be highly appreciated. Thanks.
              Last edited by kap_shar; July 14 2015, 12:00 AM. Reason: Typo error

              Comment


              • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

                दिसंबर से एनपीआर पर नॉन स्टाप सफर

                सोनू यादव, गुड़गांव 1द्वारका एक्सप्रेस-वे (एनपीआर : नार्दन पेरिफेरल रोड) का सफर दिसंबर 2015 से सुगम होने जा रहा है। दिसंबर के बाद लोग बगैर रुके 18 किलोमीटर लंबे इस एक्सप्रेस-वे से होकर द्वारका से सीधे खेड़कीदौला होकर एनएच-आठ तक पहुंच सकेंगे।1सेक्टर-29 जिमखाना क्लब में सोमवार को हुई आला-अधिकारियों की मीटिंग में एडिशनल चीफ सेक्रेटरी पी राघवेंद्र राव ने यह नई डेडलाइन फाइनल की है। इस मीटिंग में मुख्य प्रशासक बृजेंद्र सिंह और गुड़गांव हुडा प्रशासक अनीता यादव समेत अन्य अधिकारी मौजूद रहे। 1प्लाट के लिए 502 लोगों ने किया दावा11एनपीआर में अपनी मकान या जमीन आने वाले लोगों ने हुडा के पास प्लाट के लिए आवेदन किया है। करीब 502 लोगों ने हुडा के पास आवेदन करते हुए प्लाट के लिए दावा जताया है। पंजाब एंड हरियाणा उच्च न्यायालय ने एनपीआर के सफर को जल्द मुहैया कराने के लिए हुडा को निर्देश दिए हैं कि जितनी जमीन ली जा रही है, उतने ही साइज का प्लाट लोगों को दिया जाए। साथ ही मकान बनाने के लिए समय भी दिया जाए। जिसके बाद लोगों ने ये आवेदन हुडा के पास किए हैं। अब इन आवेदनों की हुडा जांच कर पात्र आवेदकों की फाइनल लिस्ट तैयार करेगा। जिसके बाद प्लाट आवंटन की प्रक्रिया शुरू होगी। 1जमीन के बदले प्लाट देगा हुडा 1जमीन के बदले लोगों को सेक्टर- 37 सी और 110ए में हुडा प्लाट देगा। सेक्टर- 37सी का ले-आउट प्लान फाइनल हो चुका है, जबकि 110ए का अभी फाइनल होना है। सोमवार की मीटिंग में एडिशनल चीफ सेक्रेटरी ने निर्देश दिए कि जनवरी 2016 तक इन दोनों सेक्टर में मूलभूत सुविधाएं जैसे सड़क, पानी, सीवर, बरसाती ड्रेन आदि का काम पूरा हो जाना चाहिए। इसमें कोताही कतई बर्दाश्त नहीं की जाएगी। 1सोनू यादव, गुड़गांव 1द्वारका एक्सप्रेस-वे (एनपीआर : नार्दन पेरिफेरल रोड) का सफर दिसंबर 2015 से सुगम होने जा रहा है। दिसंबर के बाद लोग बगैर रुके 18 किलोमीटर लंबे इस एक्सप्रेस-वे से होकर द्वारका से सीधे खेड़कीदौला होकर एनएच-आठ तक पहुंच सकेंगे।1सेक्टर-29 जिमखाना क्लब में सोमवार को हुई आला-अधिकारियों की मीटिंग में एडिशनल चीफ सेक्रेटरी पी राघवेंद्र राव ने यह नई डेडलाइन फाइनल की है। इस मीटिंग में मुख्य प्रशासक बृजेंद्र सिंह और गुड़गांव हुडा प्रशासक अनीता यादव समेत अन्य अधिकारी मौजूद रहे। 1प्लाट के लिए 502 लोगों ने किया दावा11एनपीआर में अपनी मकान या जमीन आने वाले लोगों ने हुडा के पास प्लाट के लिए आवेदन किया है। करीब 502 लोगों ने हुडा के पास आवेदन करते हुए प्लाट के लिए दावा जताया है। पंजाब एंड हरियाणा उच्च न्यायालय ने एनपीआर के सफर को जल्द मुहैया कराने के लिए हुडा को निर्देश दिए हैं कि जितनी जमीन ली जा रही है, उतने ही साइज का प्लाट लोगों को दिया जाए। साथ ही मकान बनाने के लिए समय भी दिया जाए। जिसके बाद लोगों ने ये आवेदन हुडा के पास किए हैं। अब इन आवेदनों की हुडा जांच कर पात्र आवेदकों की फाइनल लिस्ट तैयार करेगा। जिसके बाद प्लाट आवंटन की प्रक्रिया शुरू होगी। 1जमीन के बदले प्लाट देगा हुडा 1जमीन के बदले लोगों को सेक्टर- 37 सी और 110ए में हुडा प्लाट देगा। सेक्टर- 37सी का ले-आउट प्लान फाइनल हो चुका है, जबकि 110ए का अभी फाइनल होना है। सोमवार की मीटिंग में एडिशनल चीफ सेक्रेटरी ने निर्देश दिए कि जनवरी 2016 तक इन दोनों सेक्टर में मूलभूत सुविधाएं जैसे सड़क, पानी, सीवर, बरसाती ड्रेन आदि का काम पूरा हो जाना चाहिए। इसमें कोताही कतई बर्दाश्त नहीं की जाएगी। 1

                Comment


                • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

                  Thanks Samrat.

                  Whats the good price you feel on this project. Moreover, am not sure which about the Sec-102 and Sec-109 locations and prospect.


                  Originally posted by samrats001
                  My personal choice would be Imperial Garden, much better specs and I like this builders work. Construction wise also I visited there site and they have progressed very fast. I don't know if still you can get units at good price but if you get then you would be lucky. Good Luck .

                  Comment


                  • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

                    दिसंबर से एनपीआर पर नॉन स्टाप सफर - by सोनू यादव, गुड़गांव

                    In the above newspaper report on one hand the govt. (HUDA) is saying that by january 2016 all the essential services and utilities will be made available so that means that people will be able to start construction (as construction also requires at least some of these services like roads, sewer, power, water etc.), on the same breath they are also saying that they have not even earmarked the land in sector 110A still. How does HUDA assume that people will be given possession, finish construction and move much before these services are delivered. So the deadline of Dec 2015, is meaningless and false. Unless houses are constructed people wont move and give HUDA the possession of their land for demolition and construction.

                    Reasonable approach to timelines would be that if HUDA gives possession of these plots by Sept/Oct. 2015 (even this is questionable, but let's assume they will), and assuming that development work is under way, and assuming that people people can start construction immediately thereafter and finish them in 6-9 months. (very reasonable time frame), By this time HUDA would (or should) have completed all developmental work for power, water etc. then people can move in 1-2 months. So If people move by June-July 2016, then contractor would demolish and prepare the land for construction in 1-2 months and actually lay the road in 1-2 months. so any date before Sept-Oct 2016 for the DEW connectivity at palam vihar is only an eyewash by the govt. The Delhi and KD issues are being conveniently sidelined by the Govt. Also one has to assume that the other impediments like Basai ROB and the Padmini Factory are all sorted and road laid there too.

                    I am appalled by the ridiculous way of planning and the wanton attitude of these govt. servants (who only hold these meetings for the free samosas and chai) and more ridiculous is the media which reports it like a gospel, without questioning or debating the viability of these plans or the veracity of these announcements. If these delinquent govt. officers are to be hung by their neck, then these kind of media reporters and papers should be shot by sharpshooters. Ridding the country of such people will be actual independence day.

                    I am an optimist still in my opinion NPV connection is not possible before Sept/Oct 2016 (+or- 2 months), KD if its gets sorted out of court by some means then the same time frame will hold for that area too. Otherwise add 1 year for this patch. We would assume that Basai ROB and other small impediments on the way to DEW will all get sorted within the time frame of the NPV/KD rehabilitation. That leaves only Delhi side, which might take an additional 6-9 months or happen during the same time frame, no prize for guessing this.

                    So in effect I don't see the haryana DEW running all the way upto KD by before Sept/Oct 2016 and if we are lucky with KD then may be all the way up to NH8 by Nov/Dec 2016. Also if we are super lucky then Delhi might also join by then else add 6 months to that. Most of the projects that are under construction will also be ready by then (June-Dec 2016) and people might actually travel on the DEW to their respective projects to take possession.
                    Last edited by illusionist13; July 14 2015, 05:26 PM.

                    Comment


                    • Re : NPR - Northern Peripheral Road, Dwarka Expressway, Gurgaon Updates

                      Originally posted by Bala2107 View Post
                      - by ,

                      In the above newspaper report on one hand the govt. (HUDA) is saying that by january 2016 all the essential services and utilities will be made available so that means that people will be able to start construction (as construction also requires at least some of these services like roads, sewer, power, water etc.), on the same breath they are also saying that they have not even earmarked the land in sector 110A still. How does HUDA assume that people will be given possession, finish construction and move much before these services are delivered. So the deadline of Dec 2015, is meaningless and false. Unless houses are constructed people wont move and give HUDA the possession of their land for demolition and construction.

                      Reasonable approach to timelines would be that if HUDA gives possession of these plots by Sept/Oct. 2015 (even this is questionable, but let's assume they will), and assuming that development work is under way, and assuming that people people can start construction immediately thereafter and finish them in 6-9 months. (very reasonable time frame), By this time HUDA would (or should) have completed all developmental work for power, water etc. then people can move in 1-2 months. So If people move by June-July 2016, then contractor would demolish and prepare the land for construction in 1-2 months and actually lay the road in 1-2 months. so any date before Sept-Oct 2016 for the DEW connectivity at palam vihar is only an eyewash by the govt. The Delhi and KD issues are being conveniently sidelined by the Govt. Also one has to assume that the other impediments like Basai ROB and the Padmini Factory are all sorted and road laid there too.

                      I am appalled by the ridiculous way of planning and the wanton attitude of these govt. servants (who only hold these meetings for the free samosas and chai) and more ridiculous is the media which reports it like a gospel, without questioning or debating the viability of these plans or the veracity of these announcements. If these delinquent govt. officers are to be hung by their neck, then these kind of media reporters and papers should be shot by sharpshooters. Ridding the country of such people will be actual independence day.

                      I am an optimist still in my opinion NPV connection is not possible before Sept/Oct 2016 (+or- 2 months), KD if its gets sorted out of court by some means then the same time frame will hold for that area too. Otherwise add 1 year for this patch. We would assume that Basai ROB and other small impediments on the way to DEW will all get sorted within the time frame of the NPV/KD rehabilitation. That leaves only Delhi side, which might take an additional 6-9 months or happen during the same time frame, no prize for guessing this.

                      So in effect I don't see the haryana DEW running all the way upto KD by before Sept/Oct 2016 and if we are lucky with KD then may be all the way up to NH8 by Nov/Dec 2016. Also if we are super lucky then Delhi might also join by then else add 6 months to that. Most of the projects that are under construction will also be ready by then (June-Dec 2016) and people might actually travel on the DEW to their respective projects to take possession.
                      DEW continuous not before Dec 2017 AT THE EARLIEST.

                      This is India.

                      2015 is over.

                      Two years is minimum time to have this road in place with ROB but without any of the flyovers.
                      Venky (Please read watch a or before posting)

                      Comment